Energy Efficiency — EaaS · Active
EaaS Project — Active
LED & HVAC Retrofit · 4 Sites · Month 8 of 84
Energy Saved
62%
vs. pre-project baseline
Annual Savings
$148,000
Verified per IPMVP
Project Payback
On Track
7-year EaaS term
CO₂ Reduced
86 tCO₂e
Per year, 4 sites
Savings Performance
Energy consumption before vs. after retrofit
Monthly
kWh Consumption — Before vs. After Retrofit
Pre-Retrofit Baseline
Post-Retrofit Actual
Project Details
Your active EaaS installations
💡
LED Retrofit — 4 Sites
Full LED conversion: ballrooms, meeting spaces, corridors, and parking. Bluetooth mesh dimming controls installed.
Complete
⛏
HVAC Upgrade — 2 Sites
3 rooftop units replaced with high-efficiency equipment at 2 priority sites. Variable-speed drives installed.
Complete
📊
M&V Active
Monthly measurement and verification per IPMVP Option B. Savings verified against pre-retrofit baseline.
Monthly
Milestones
Program Roadmap
Complete
ASHRAE Level 2 Audit
Full energy audit across 4 sites. LED and HVAC opportunities quantified. $148,000 annual savings projected.
January 2025
Complete
Project Installation
LED retrofit and HVAC replacement completed across all 4 sites. No disruption to operations.
Feb–Apr 2025
now
EaaS Term Active
Month 8 of 84-month EaaS term. Savings verified monthly. On track with projections.
May 2025 →
Upcoming
Year 1 Performance Review
STS delivers full Year 1 M&V report and savings summary.
May 2026
Future
EaaS Term Complete
Full project paid back through savings. All equipment ownership transfers to client.
2032
Documents
Your program file
📊
ASHRAE Level 2 Audit Report
4 Sites · January 2025
Download →
✅
Installation Completion Report
LED & HVAC · April 2025
Download →
📊
M&V Report — Month 8
IPMVP Option B · December 2025
Download →
💵
EaaS Payment Summary
Monthly · Updated Automatically
Download →
Expand to Additional Sites
8 sites not yet enrolled in the EaaS program. STS can add them to the existing term or create a new project scope.
Take Action →
Phase 2 — Controls and BMS
Advanced building controls and BMS integration can deliver an additional 10–20% savings on top of the LED and HVAC upgrades.
Learn More →
JS
Josh Shank
Energy Services Representative
800.949.9881 · solutions@stsusgroup.com
Contact Rep →